以下参考译文使用的是机器翻译,因此可能不完全准确
- 联排别墅,两面(T3或T4),豪华装修 - 地下室,底层和一楼 - 楼层-1:车库,大厅和洗衣房/机房 - 楼0:厨房和客厅/饭厅),卫生间厕所 - 1楼:3或4间卧室(1间套房,可进入3间套房) - 占地195平方米 - 90平方米的部署面积 - 270平方米的总建筑面积 - 67.50平方米的露台花园和游泳池6X3(额外)的可能性 - 主要特点:。直线和现代的线条,平屋顶。带罩的外套(6厘米)。所有楼层的玻璃阳台。内联排水沟。门(三通道)和滑动窗户。 2辆车的车库(并排)。客厅/饭厅和“开放空间”的厨房。有岛的大厨房。主人套房32平方米,与“步入式”壁橱和完整的浴室,俯瞰宝耶稣(初生)。松开马桶座圈。铝质电热百叶窗和隔热材料。太阳能板。预装空调。预先安装电加热。预安装警报。预安装环境声音 - 在“BELA VISTA - GUALTAR ENCOUNTER”顶部非常安静的地方(街道/出口) - 极好的阳光照射(东西) - Bom Jesus和Braga-的壮丽景色布拉加新医院和米尼奥大学交钥匙概念。 :联系我们咨询介绍和3D图像的档案(说明);不排除规范的咨询; (预期)最长执行时间:1年。
- Townhouse, with 2 fronts (T3 or T4) and with luxury finishes- Basement, ground floor and 1st floor- Floor -1: garage, hall and laundry room / machine room- Floor 0: kitchen and living / dining room (open space), WC toilet- Floor 1: 3 or 4 bedrooms (1 suite w / walk-in closet - possibility of 3 suites)- Lot with 195m2 of land- 90m2 of deployment area- 270m2 gross floor area- 67.50m2 of patio with garden and possibility of swimming pool 6X3 (extra)- Main features:. straight lines and modern, flat coverage. outer jacket with hood (6 cm). balconies on all floors with glass shelter. inline gutters. doors (in triple channel) and sliding windows. garage for 2 cars (side by side). living / dining room and kitchen in "open space". large kitchen with island. master suite with 32m2, with "walk-in" closet and full bathroom and overlooking Bom Jesus (spring). loos of WC's suspended. electric shutters in aluminum and with thermal insulation. solar panels. Complete installation of Air Conditioning. Heat recover. pre-installation of electric heating. pre-installation of alarm. pre-installation of ambient sound- In a very quiet place (Street s / exit) at the top of "BELA VISTA - GUALTAR"- Excellent sun exposure (east-west)- Stunning views of Bom Jesus and Braga- Location near the new Hospital of Braga and the University of Minho- "Turnkey" conceptObs. : contact us to consult the dossier of presentation and 3D images (illustrative); does not dispense with the consultation of the specifications; (expected) maximum execution time: 1 year.